- The foot bridge on the 8th creek was built.
- The second cart path bridge was built and load tested, successfully, with the tractor and trailer.
- The 9th fairway pipe installed - immediate drainage of the "Cemetery Drain" - more success.
- The earthworks for the 8th Fairway drain pipe and creek closer to the green completed ready for piping tomorrow.
Thursday is replacing the turf - so if you can lend a hand and a few hours that would be fantastic.